Camphill Retaining Wall Works Nuneaton

Over 800m of retaining structure comprising of: reduced level dig for foundations, RC foundations, full length land drain as an addition to incorporating deck-drain and no fines concrete. Precast concrete block units placed upon foundations with heights varying from 3m to 7.5m.

Please follow this link below for an aerial drone view of the wall.