New accommodation Alcester Rd Studley
A 2.5m high x 80m long RC retaining wall structure with piled foundation, capping beam, 2-sided highway retaining wall. 4m deep excavation, cleaning the face of the piles, forming a recess between each pile and facing the piles with an RC single sided liner wall circa 4m maximum dropping to 2m to follow the formation contour.






